The Commission issued standard procedures and a standard interconnection agreement for the interconnection of generators larger than 20 megawatts.
The Commission rules that apply to the interconnection of small generators no larger than 20 megawatts.
The Commission is reviewing the need for technical requirements for the interconnection of large and small wind generators and other alternative technologies, and the need for creating specific requirements for their interconnection to the grid.